At least five different subs were at work on the building Friday morning. The steeple contractor was back to finish sealing and flashing, the metal guys were roofing the drive-through, the mechanical sub was installing ductwork, the carpenters were framing inside work, and the stucco sub was working on all four sides of the building on base prep and trim profiles. The rear vaulted section is now enclosed -- it had been the last major open section. Stucco prep will begin there next week and is well underway on all other parts of the exterior. Expect the round window openings on the high west and east faces to be cut next week.