It's not exciting or visually impressive, but anyone who has built a house knows that when the sheetrock starts going up a construction milestone has been reached. Preparation for the high tongue-and-groove ceilings has also started as our own Leif Whaley has begun attaching the furring strips. Pray for his safety as he works 39 feet above the ground. Also, the lower exterior windows are going in today. Give thanks for progress!
Leif stands in the toddler room. He's not doing the sheetrock but is glad to see it going up like the rest of us!
Sheetrock on interior side of north rooms - seen from balcony.
Furring strips high above the narthex. Ceiling boards will be attached to these.
Stacy and Paul of Studio 4 met with our site superintendent onsite today to iron out some details. Stacy said they were working with an organization in Oak Ridge recently who were full of praise for our building's appearance. He said everyone in the room had noticed it and all were interested to know that Studio 4 was involved.
The high safety wall on the balcony has been removed and has been replaced by the permanent framing for the low wall. The photo below with Stacy (for scale) shows how low the solid wall will be. The low-profile aluminum railing is in production and will arrive in few weeks.
Note the new lower balcony wall framing. The sight lines should be very good. Remember, the seating will be tiered but the risers won't be built until after we move in.
Dan, Stacy, and Paul confer.
Removal of more scaffolding gives a better look of the front. Motorists on S. Illinois Ave. now have a pretty clear view of the building at 3000 Clearview Court.
Are we on schedule? We should learn the answer to that question by next week as Construction Plus will be providing an update for us. The Oak Ridge Fire Department was on site today looking at the sprinkler installation and that seemed to go well. Continue to pray for good progress, good decisions, and no snags.
The removal of some scaffolding affords a better view of the finished stucco on the high portion of the building front. The parapet caps, which will be white, are not on yet. The stucco and window surrounds are also finished on the west clerestory, and more than half of the window glass has been installed in the east clerestory.
A point of information: Should you visit the new building and find the balcony rail to be very high and crude, never fear. The one you see is temporary. The real rail will be quite low and trim.
A beautiful morning sheds flattering light on the front facade of the building. You can see that some of the final color is finished on the front stucco but mostly it is still obscured by the scaffolding. The view of the rear (with stucco almost complete) was made Friday night. Notice that the "real life" color of the stucco is actually more appealing than that in the drawing at the top of the page. Please pray for the building committee as the began meeting more frequently in the last quarter of the project. Many decisions, much planning, and lots of work remains. And give thanks for good progress so far.
The two rear window openings nearest the corners have finally been cut. They were late in coming because we were late in deciding on them. Because the rear of the building looms so large when you enter from the cul-de-sac we thought the windows would make it more attractive and "building-like" than it would have been with only the center pair. It also makes the corner rooms - one of which is the pastor's office - more pleasant. See captions for more info.
Note new window opening on right.
Pastor's office, northwest corner.
Same as above, different angle.
Balcony wall - window openings look down on narthex.
Note muntins in clerestory windows - glass next week.
Window frames (sans glass) now fill the south clerestory openings. Also, see detail of the base block with nice moulding above the top course - a nice touch.
Rear gable stucco (in final colors) seen in a better light than earlier post
Gray polished base block with cast moulding
Highly-paid male model adds human scale to the window openings that will look down on the narthex from the rear of the balcony level. Note model's purple paisley tie.
Exciting developments today -- some of the final stucco finishes have been applied to the rear gable and the south clerestory. Remember, the scheme is white for parapets, light gray for main wall surfaces, and a warm dark gray for window surrounds and the polished block around the base. Also the aluminium window frames for the clerestory have arrived and should be installed today. Further, the "ship's prow" balcony room walls are framed. See the video below as it's difficult to "see" in one picture. Note that large windows will look down on the narthex. This will be a very unique feature and is one of the many that should lift our building out of the cookie cutter or generic categories! See captions for further details.
Seen front front door area, standing in narthex, looking up - sorry for lack of narration.
The concrete balcony floor was poured last week and stucco work continues with another layer (not the final color) over the back gable and clerestories. See further details in captions.
View from middle of balcony
View from right front balcony ledge - safety rail is temporary.
Large back room - pray for your building committee and officers as we consider how best to utilize space.
Back gable covered with another layer of sealant.
Rough framed balcony stairs.
Fire riser in mechanical room - supplies fire sprinkler system.
The openings for the round windows have been cut and more interior framing has been done. The electricians are also busy running conduits and installing boxes.
Rear window seen through south side clerestory windows