March 22, 2011
Shaping up
The gravel did not go down today but should go tomorrow (Wednesday). Today was spent fine tuning the grading of parking areas which was double-checked by our engineer. The base layer of asphalt will follow Thursday or Friday, weather permitting. One notable improvement is that the bank/berm behind the building/to the right of the entrance from the cul-de-sac has been dressed up, covered with topsoil and landscape netting. It looks really good.