| Clear view from Tuesday evening of the west and south sides with scaffolding removed. |
August 17, 2011
Color scheme nearly complete
The stucco/exterior color scheme is basically complete. The round windows and parapet caps remain to be done. Note that they are working on sealing the wall on the south side now, which had been left open for bringing in large equipment. The front entry will be left uncompleted for some time as that will be the only exit that remains large enough for the scissor lifts that are still needed to complete the ceiling. The site is very busy today with at least 14 contractor trucks on site and nearly every specialty at work.