April 07, 2011

Scattered

The steel is no longer in a group of piles behind the building. After erecting the perimeter columns today the crew spent the rest of the afternoon distributing the steel around the pad and parking lots, placing the columns and beams nearest where they'll ultimately go. Watch for the crane and lifts as you drive by -- and watch for the growing skeleton of the building.

The grading contractor is still at work as well. In the photo below you can see that the bank behind the building has been covered with landscape fabric. It may be green soon.

View at 8 pm tonight